National Master of Towing OC, NC, GL-IN, WR (USCG-MOT) Exam Prep
Free practice questions

Free USCG-MOT Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

These 10 free USCG-MOT questions are organized by exam domain, so you can see how each part of the National Master of Towing OC, NC, GL-IN, WR (USCG-MOT) blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Rules of the Road: Inland and International Q100 (TV01/TV02), or Inland Q300 (Western Rivers TV03)

Question 1

Under the International Rules, a tug towing astern and a ferry are crossing in clear visibility, outside a narrow channel or traffic separation scheme. Neither vessel has restricted maneuverability. The ferry approaches from the tug's port side and makes an early, substantial alteration to pass astern of the entire tow. Repeated observations confirm that the ferry's action is effective. What should the tug do during the passage?

Show answer & explanation

Correct answer: A - Maintain course and speed while monitoring the ferry's passage.

Question 2

An upbound towboat and a downbound towboat with a following current are meeting in a narrow channel on the Mississippi River. They are in sight, 0.4 mile apart. The downbound master proposes a starboard-to-starboard passage and sounds two short blasts. The upbound master determines that the proposed passage is safe, although the upbound tow is larger. What is the appropriate response?

Show answer & explanation

Correct answer: B - Answer with two short blasts and permit the proposed passage.

Domain 2: Deck General: Q410 (OC/NC), Q418 (Great Lakes and Inland), Q423 (Western Rivers)

Question 3

An ocean tug is towing a loaded barge on a wire hawser. In a long swell, the wire repeatedly lifts nearly clear of the water and snatches tight as the vessels separate. There is ample sea room and water depth, and more hawser can safely be paid out. Which adjustment most directly cushions these peak loads?

Show answer & explanation

Correct answer: C - Pay out more hawser to increase the available catenary.

Question 4

A twin-screw towboat moving ahead in a straight, narrow river reach draws close to the starboard bank. Her bow begins to sheer to port while her stern moves toward the bank. Both rudders follow helm orders, engine loads are balanced, and the wind is negligible. Which mechanism best fits this combination?

Show answer & explanation

Correct answer: C - Bank cushion at the bow combined with bank suction at the stern.

Question 5

Before loading petroleum into a tank barge, the vessel and shore persons in charge complete the required pretransfer inspection and agree on communications and shutdown procedures. Neither has signed the Declaration of Inspection. The shore operator asks to start at a low rate while the signatures are obtained. What must happen before oil starts flowing?

Show answer & explanation

Correct answer: A - Both persons in charge must sign the Declaration of Inspection.

Domain 3: Deck Safety: Q411 (OC/NC), Q419 (Great Lakes and Inland), Q424 (Western Rivers)

Question 6

Shipyard personnel plan a routine inspection inside a barge void under 29 CFR 1915.12. Calibrated sampling throughout the space shows 20.8% oxygen and flammable vapor at 14% of the lower explosive limit (LEL). Tested toxic contaminants are below their applicable exposure limits. No hot work is planned. How should the competent person classify the space for this entry?

Show answer & explanation

Correct answer: D - Not safe for workers; 14% LEL exceeds the 10% routine-entry threshold.

Question 7

A tug's machinery-space fire continues after the initial portable-extinguisher attack. All personnel are outside and accounted for. Fuel, machinery, and ventilation have been shut down as required by the installed total-flooding CO2 system's procedures, and the space is closed. The release station is safely accessible. What is the next firefighting action?

Show answer & explanation

Correct answer: D - Discharge the fixed CO2 system and keep the machinery space sealed.

Domain 4: Navigation General: Q412 Near Coastal OR Q413 Oceans; Q420 Great Lakes and Inland; Q425 Western Rivers

Question 8

While following the Atlantic Intracoastal Waterway southbound, a towing vessel reaches an intersection with a separately marked channel. A red nun buoy carries a yellow square. The chart confirms that the vessel is continuing along the ICW rather than turning into the other channel. How is this buoy to be passed?

Show answer & explanation

Correct answer: B - Keep it to port because the yellow square governs this ICW passage.

Domain 5: Navigation Problems: Chart Plot: Q414 (OC/NC), Q421 (Great Lakes and Inland), Q426 (Western Rivers)

Question 9

A navigator takes a corrected bearing of a lighthouse at 0810 and a corrected bearing of a different charted tower at 0825. The tug has moved between observations, and its intervening ground displacement is established. The navigator intersects the two original bearing lines and labels the crossing an 0825 fix. How must the plot be corrected?

Show answer & explanation

Correct answer: D - Advance the 0810 line parallel to itself by the ground displacement, then intersect it with the 0825 line.

Domain 6: Navigation Problems: Near Coastal (Q415), TV01 OC/NC routes

Question 10

A compass check on a steady heading gives a shore-range bearing of 146° true and 151° by the standard magnetic compass. Current variation is 3° west. The deviation to record for this heading is:

Show answer & explanation

Correct answer: A - 2° west

The rest of the USCG-MOT blueprint

The USCG-MOT exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more USCG-MOT questions with explanations.

Continue in the free practice test →

View plans